Gully / inlet spacing module
- Corridor width and slopes (cross and longitudinal)
- Roughness coefficient(s)
- Allowable spread constraints
- Segment discretization/spacing assumptions
Steps
- Define the road drainage segment/profile.
- Enter hydrology inputs for contributing runoff (or reference previously computed \(Q\)).
- Run gully spacing logic and review:
- spread
- required inlet length and capture efficiency
- bypass progression
- Run sag checks where applicable and compute required inlet counts.

Review checklist
- Spread is within allowable constraints.
- Capture efficiency is consistent with inlet length and flow.
- Bypass does not grow unexpectedly between successive segments.